TOPOGRAPHIC SURVEYING


Create lightweight CAD models from your drone data




   START FREE TRIAL   






SURVEY CURB AND GUTTER
Survey the back of the curb first. Then, model the complete curb by creating offset lines from that first line. Some offset parameters you obtain from field measurements. Others you derive from your drone data. More survey tools...
  • 1Draw lines & arcs
  • 2Offset lines
  • 3Interpolate under cars
  • 4Export to CAD

BASELINE SURVEYS
The low-pass gridding tool is ideal for extracting ground points in closed landscapes like forested or urban areas. The algorithm does the bulk of the work and you provide the final edit. More gridding tools...
  • 1Low-pass points
  • 2Draw breaklines
  • 3Surfaces as contours
  • 4Export contours to CAD

ROAD SURVEYS
The section lines tool allows you to create road surfaces in short time frames. Simply create a road center line, generate section lines and capture the topographic detail with the densify and edit functions. More productivity tools...
  • 1Layers & Descriptors
  • 2Section Lines
  • 3Add field measurements
  • 4Export to CAD

SURVEY FLOWLINES
Knowing how water flows is important for road safety and construction developments. Terrain lenses instantly highlight information from your drone data that give insight in the waterflows. More on terrain lenses...
  • 1Slope directions lens
  • 2Contours lens
  • 3Assess water flow
  • 4Draw the flowline

Ease of use and time savings are simply amazing

Mark Paulson, RPLS, Vertical Aspect